Generators are compact, dense and often destined for awkward spots: a plinth behind a hospital, a plant deck on a commercial roof, a cage beside a data room. A Franna can unload a generator from the delivery truck, carry it to its pad and set it down accurately for the electrical crew.
Why generators need careful planning
A generator set is heavy for its footprint. The engine and alternator make up most of the weight and sit low in the frame, but the acoustic enclosure, radiator and any base tank change the overall weight and the balance. Generators are usually supplied with designated lifting points on the base frame or the enclosure roof. The manufacturer's drawings show where they are and how the set should be slung.
- Confirm the dry weight and wet weight. A base fuel tank that has been part-filled for testing adds weight, and diesel can move inside the tank.
- Confirm the lifting points and whether a spreader or lifting frame is required to avoid crushing the enclosure.
- Check the centre of gravity marking if the supplier provides one. Generators are often heavier at the engine end.
Common generator jobs
- New standby sets for hospitals, aged care, schools and data rooms
- Replacement of old sets at the end of their service life
- Temporary generators for events, shutdowns and building sites
- Rooftop or plant-deck installs on low and medium-rise buildings
- Generators moved inside large plant rooms through wide doors
Set-down and positioning
The pad or plinth must be ready, level and cured. Anti-vibration mounts, cable entries and fuel connections are usually set out on the pad, so the generator needs to land in an exact position. A dogman guides the set down slowly while the electrical crew checks alignment. The crane holds until the set is seated correctly.
Working at operating sites
Most generator installs happen at sites that cannot stop: hospitals, aged care, data rooms, factories. Lifts are often booked early in the morning or on weekends, with car park areas closed off and pedestrians managed. A temporary generator may be connected while the old one is swapped, which means two lifts in one visit.
Franna hire questions
How heavy is a standby generator?
It depends on its rating, enclosure and tank. The manufacturer's specification sheet gives the weight, which is what we plan the lift on.
Should the fuel tank be empty?
Ideally, yes, or as low as practical. Fuel adds weight and can shift during the lift.
Can you swap an old generator for a new one in one booking?
Yes. Removing the old set and placing the new one is commonly done in a single visit.
Tell us what you need lifted
Send the load, its rough weight and size, the site address and the date. Photos of the load and the access help us size the right crane first time.
- Licensed and insured operators
- Day, after-hours and weekend lifts
- Brisbane, Gold Coast and Sunshine Coast
- Written quote before the job is booked
Prefer email? info@frannacranehirebrisbane.com.au
Request Received
Thanks ! Someone from Franna Crane Hire Brisbane will call you back shortly. For emergencies right now, please call us directly.
Call 07 3103 9872